10-01-2023, 06:22 AM
yo.
the poles are like this. 2 double chevrons making 4 diamonds. This pic is one double chevron. The rotor is that twice connected into itself.
And here is the coil core setting up. Epoxy and iron filings.
I should be able to get 2 of these coils in there crossing at a 90. I want to test a single before trying to figure that out though.
the poles are like this. 2 double chevrons making 4 diamonds. This pic is one double chevron. The rotor is that twice connected into itself.
And here is the coil core setting up. Epoxy and iron filings.
I should be able to get 2 of these coils in there crossing at a 90. I want to test a single before trying to figure that out though.

